Project Case Studies

Delivered. Energised.
Running for Years.

Real Schneider switchgear deliveries across five continents — hyperscale data centers, oil fields, airports, utility solar plants and national grids. Every case below is verifiable: serial numbers, FAT reports and client references on request.

Browse by Industry

2,000+ Units Delivered · 15+ Countries · 0 Failed FATs Since 2022 · Verifiable Schneider Serial Numbers

Hyperscale Data Center Power Module Middle East — Saudi Arabia
Data Center

Hyperscale Data Center Power Module

Challenge
Extreme 50 °C ambient desert conditions requiring non-derated continuous operation, with a compressed 12-week delivery window.
Solution
Engineered Blokset Form 4b modules with forced ventilation channels, high-conductivity busbars and pre-integrated EcoStruxure thermal monitoring.
Result
Delivered in phased shipments in 28 days. Zero switchgear downtime across 2+ years of operation; contributed to facility PUE of 1.25.
The engineering team solved our temperature derating problem in the design phase, not on site.
Read Full Case Study View Data Center Solution
11kV Desert Substation Package Middle East — Iraq
Oil & Gas

11kV Desert Substation Package

Challenge
Remote onshore oil field with tight grid-connection deadline and harsh desert operating environment.
Solution
Containerized package: 8 × MVnex 12kV panels + 6 × SM6 RMUs, engineered and FAT-tested as one coordinated delivery.
Result
9 weeks order-to-dispatch · 100% first-pass FAT · energized on schedule.
Read Full Case Study View Oil & Gas Solution
24kV Gas Gathering Retrofit Middle East — Oman
Oil & Gas

24kV Gas Gathering Retrofit

Challenge
Live gas plant requiring retrofit without production interruption, coastal C5-M corrosion environment.
Solution
14 × PIX panels with C5-M marine-grade coating, phased cutover plan executed with operations team.
Result
Energized 11 days ahead of COD · zero unplanned outages during cutover.
Read Full Case Study View Oil & Gas Solution
12kV Refinery Switchroom Expansion Europe — Refinery
Oil & Gas

12kV Refinery Switchroom Expansion

Challenge
Expanding refinery switchroom capacity while the existing 11kV system stayed live and production continued.
Solution
Blokset Form 4b lineup with staged tie-in engineering and live-switching method statements.
Result
Zero-downtime cutover across 6 tie-in windows · passed inspection first attempt.
Read Full Case Study View Oil & Gas Solution
Airport Terminal MV/LV Power Distribution East Africa — International Airport
Infrastructure

Airport Terminal MV/LV Power Distribution

Challenge
Greenfield airport terminal with 3-phase civil construction programme over 18 months and zero-tolerance public-safety requirements.
Solution
24 × MVnex 24kV + 48 × Blokset LV panels, delivered in 3 phases with IEC type-test reports and FAT video before each dispatch.
Result
All 3 phases passed SAT on first attempt · 72 units · 0 NCRs at site acceptance.
Funator delivered Phase 1 two weeks ahead of schedule. The FAT video documentation and IEC test reports arrived before the containers — our consultant approved everything without a single query.
Read Full Case Study View Infrastructure Solution
Solar Booster Substation, Desert Site Middle East — 100 MWAC PV Plant
Renewable Energy

Solar Booster Substation, Desert Site

Challenge
+52 °C summer ambient, sand ingress, and an immovable grid-connection COD tied to the inverter delivery schedule.
Solution
16 × MVnex 36kV panels + 8 × inverter-skid LV packages, IP54 enclosures with sand filters and C4 coating, phased over 6 months.
Result
Energized on original COD · SAT passed first attempt · 0 NCRs.
Our inverter supplier was two weeks late but the switchgear was already on site and FAT-approved. That margin saved our COD.
Read Full Case Study View Renewable Energy Solution
110kV Substation Project Africa — Nigeria
Power & Energy

110kV Substation Project

Challenge
State utility project with 200+ MV panels required and a tight, non-negotiable grid-connection deadline.
Solution
200+ MVnex panels supplied from Heji Group ready stock, phased delivery in 25 days with full documentation package.200+ MVnex panels supplied from Heji Group ready stock, phased delivery in 25 days with full documentation package.
Result
Project timeline shortened by 30% · connected on schedule.
Funator delivered genuine panels faster than any regional supplier we have worked with.
Read Full Case Study View Power & Energy Solution
Onshore Wind Farm Collector Network Central Asia — 200 MW Wind Farm
Renewable Energy

Onshore Wind Farm Collector Network

Challenge
38-turbine wind farm on the steppe: -30 °C winters, 40 km collector footprint, and a lender-mandated SF6-free network.
Solution
38 × SM AirSeT SF6-free pad-mount RMUs + MVnex 36kV substation with cold-chamber-verified FAT and IEC 61850 SCADA.
Result
98.7% availability in year 1 · energized before the first winter · zero unplanned site visits.
The SF6-free requirement was non-negotiable for our lenders. Funator shipped it without drama — and the cold-chamber FAT gave everyone confidence before the first winter.
Read Full Case Study View Renewable Energy Solution
200 MWh BESS Grid Stability Project Southeast Asia — Island Grid
Renewable Energy

200 MWh BESS Grid Stability Project

Challenge
100 MW / 200 MWh storage plant for island grid frequency regulation — with lender documentation as a financial-close condition.
Solution
Okken rapid-duty LV skids + MVnex 33kV interconnection, SGS-witnessed FAT, UL 9540 / IEC 62933-aligned package.
Result
Response 4× faster than grid code · 3,000+ cycles with zero trips · documentation accepted without comment.
The documentation was the make-or-break for our lender. Funator's FAT pack arrived complete — SGS witness signatures and all — before the containers left the factory.
Read Full Case Study View Renewable Energy Solution
Large Hospital Essential Power System Middle East — Gulf
Infrastructure

Large Hospital Essential Power System

Challenge
400-bed hospital replacing its 30-year-old backbone while ICU and surgery stayed live — IEC 60364-7-710 Group 2 circuits included.
Solution
MVnex 24kV + PrismaSeT Form 4b with medical IT monitoring on 40 rooms; cutover rehearsed and executed over one weekend.
Result
Zero interruptions on critical circuits · authority inspection passed first time.
Patient transfer weekend was flawless — not a single supply interruption on any critical circuit. The rehearsal discipline Funator brought made the difference.
Read Full Case Study View Infrastructure Solution
Container Terminal Quayside Power West Africa — Container Terminal
Infrastructure

Container Terminal Quayside Power

Challenge
Terminal doubling to 1.2M TEU: four new STS cranes in a C5-M salt-fog, monsoon and ore-dust environment with a fixed vessel arrival date.
Solution
MVnex 36kV outdoor kiosks with C5-M marine coating + Blokset crane feeders with harmonic filter interfaces.
Result
All 4 cranes load-tested within a week of berthing · zero corrosion findings after first monsoon.
Salt air destroys cheap switchgear in two years. After the first monsoon, this still looks new — and the coating certificates satisfied our port authority's surveyor.
Read Full Case Study View Infrastructure Solution
Industrial Plant LV Retrofit Europe — Germany
Industrial Manufacturing

Industrial Plant LV Retrofit

Challenge
Automotive plant LV retrofit requiring CE and IEC 61439 compliance with minimal production downtime.
Solution
BlokSeT switchgear + PrismaSeT control cabinets, fully type-tested, installed over planned weekend windows.
Result
Two years running, zero switchgear downtime.
Documentation, certification and delivery were exactly as specified — no surprises.
Read Full Case Study View Industrial Manufacturing Solution
Your Project Could Be the Next Reference on This Page. Send your single-line diagram, load schedule or even a rough scope — senior engineers return a matched configuration, documentation list and lead-time commitment within 24 hours.